| |
| 
Component drawing
|
Planning and consulting
With its state-of-the-art communication and production technology,
fintec provides customized turnkey solutions – from consulting
through planning, production, and assembly to commissioning.
We can also help you meet legal requirements and regulations, such
as ATEX (Explosion Protection Directive) and health and safety laws.
Explosion protection
Fintec can draw up the explosion protection documentation for your
filter and fume extraction equipment, which is a legal requirement
in the European Union since 2003. Health and safety
Many installations have to be regularly inspected to ensure their
conformance to health and safety regulations. Fintec can draw up the
inspection log books for your dust and welding fume extraction equipment
required by law.
These services are provided on-site at the customer’s premises.
|
fintec saugsysteme, Englandstraße 1, 58675
Hemer, Germany, Tel.: +49 (2372) 550644 |
|